As part of finalizing the design for the Phase 1 Wastewater Collection System Project, soil boring evaluations will be conducted during the week of March 02, 2026 and the week of March 9th, 2026.
These investigations are necessary to evaluate subsurface conditions and support final engineering design. Work will result in minimal disturbance, and all disturbed areas will be restored upon completion. A police detail will be present with the drilling crew to maintain traffic safety. Soil boring activities will occur on the following roadways:
Alston Ave
Apple Way
Bayview Ave
Brittany’s Way
Candlewood Dr
Cestaro Way
Chester Ave
Chipman St
Chokeberry Dr
Deborah Doane Way
Deepwood Dr
Deerfield Ln
Depot Rd
Dory Ln
Eldia Way
Fairview Ave
Forrest Ave
Glacier Hills Rd
Holmes Rd
Jason Dr
Kettle Hole Rd
Knowles St
Laura Ln
Locust Rd
Lupin Way
Massasoit Rd
Meetinghouse Rd
Melinda Ln
Mill Rd
Moll’s Pond Rd
Moore Ln
Northwood Rd
Oak Rd
Old Country Rd
Old Orchard Rd
Orchard Dr
Polly Seabury Way
Preservation Way
Railroad Ave
Redberry Ln
Route 6
Sandflower Dr
Sandpiper Way
Schoolhouse Rd
Sharon Circle
Spinnaker Way
Split Rail Rd
Starlight Ln
Sullivan Ln
Surrey Dr
Turtle Pond Rd
Walters Way
Whidah Ln
Wild Goose Ln